Du bist hier: Referate Datenbank | Englisch
| Production technique
Production technique
English preparation
PRODUCTION TECHNIQUE
Hoffer Gusztáv 5hba 1997
Topic:
FLEXIBLE MANUFACTURING
SYSTEMS,
COMPUTER INTEGRATED
MANUFACTURING
FMS AND CIM - A SURVEY
INCLUDING
STRATEGY, REASONS AND CONSEQUENCES OF IMPLEMENTATION,
SUBSYSTEMS AND TECHNOLOGY
1 WHAT IS MEANT BY FMS?
The key issue weather for small and large institutions is to produce and
design products „to order“ rather than „for stack“ to
cut manufacturing costs and to stay in business in the future. Flexible
manufacturing systems in this sense offers the fabrication facilities and
techonologies for this concept. (This facilities may include testing, packaging,
painting a. o.)
2 WHAT IS MEANT BY CIM?
CIM is connected with a lot of likesome elements, but their information
flow inbetween is not very clear, because CIM is connected with a lot of
elements. The essence of CIM can be shown best with integration, though CIM was
not designed for strict declarations. The CIM concept shows further the
historically grown action areas of electronic data processing for each
department.
2.1 Definition of CIM
Computer Integrated Manufacture is concerned with providing computer
assistence, control and high level integrated automation at all levels of
manufacturing (and other) industries, by linking islands of automation into a
distributed processing system. The technology applied in CIM makes intensive use
of distributed computer networks and data processing techniques, Artificial
intelligence and Data Base Management Systems.
Computer Integrated Manufacturing covers all activities related to the
manufacuring business, including:
♦ Evaluating and developing different
product strategies.
♦ Analysing markets and generating
forecasts.
♦ Analysing product/market
characteristics and generating concepts of possible manufacturing
systems.
♦ Evaluating manufacturing capacity,
scheduling and control strategies relating to the design and fabrication
processes involved in the particular product.
♦ Analysing and feeding back certain
selected parameters relating to the manufacturing processes.
♦ Analysing and providing data at the
appropriate level and time and in the appropriate format.
2.2 The typical life cycle diagramm
The diagramm shows the typical life cycle of almost every product. After a
short introductory phase you find out wheather the product is going to be
well-sold or not. If not, there is no need for the product, we say the product
type has failed. With the help of publicity and promotion, the product gets into
an increasing demand phase, the uncertainty of the customer has been overcome
(überwunden). After this phase the product is acknowledged by the customer
and accepted on the market. This phase lasts as long as the product is
competitive on the market, which means it is modern or pretty enough. For
example jeans enjoy this phase over decades. But nothing lasts forever.
Sometimes the product gets into a declining phase. If we compare this to the
automobile sector we find out the following: After a couple of years, the car is
not up-to date, even if the car is addapted or facelifted. If there is no
readiness for buying that car, the car gets into a declining phase. Of coarse
spare parts must be produced for several years to come.
In order to achieve the maximum benefits of flexible automation, one needs
to implement CIM.
2.3 CIM. The business strategy
Today in order to stay in business and prosper, manufacturing enterprises
are seeking higher effectiveness and competitveness across the entire cycle of
marketing, product design, manufacture, test and sales. An increasing number of
them have chosen and are choosing various levels of CIM as a solution.
- Some important aspects of the conclusions that by
applying CIM technology:
- Engineering design costs can be reduced by
15-30%.
- The overall lead time can be reduced by
30-60%.
- The product quality can be increased
dramatically, as measured by the yield of acceptable product, offering 2-5 times
the previous level.
- Productivity of production operations can be
increased by 40-70%.
- Operating time related productivity can be
increased by 2-3 times.
2.4 The components of CIM
In comparison with FMS, CIM is mainly concerned with the information
processing tasks at all levels of the factory and its management, including PPS,
CAD, CAM, (CAP, CAQ) and the business data processing system, wheras FMS
provides the essential computer controlled manufacturing tools and shop floor
control systems for CIM to execute the computer generated plans and schedules
that take account of a total system rather than just on cell or shop.
CIM faces these problems in production, but its no solution, which can be
installed rapidly.
CIM is not to be understand as a new hard- or softwareproduct. Its a
philosophy of integration of each informationflow in business and though a
concept, to rationalizating information flows.
2.4.1 Product Planing and Control System (PPS)
Within the Product Planing and Control System we understand the tasks of
business and commercial work, including every kind of administrative activity,
which is necessary to supervise and control production run. PPS covers the hole
production process.
PPS is diveded in sub-groups as follows:
|
Deutsch
|
English
|
|
Produktions- und Programmplanung
|
production- &
programplaning
|
|
Mengenplanung
|
quantity planing
|
|
Termin- und Kapazitätsplanung
|
appointment- &
capacity planing
|
|
Auftragsveranlassung
|
instruction arrangement
|
|
Auftragsüberwachung
|
instruction supervise
|
2.4.2 Computer Aided Design (CAD)
its the short cut for computer aided designing of construcion drawings and
calculatings. The great goal of CAD is the accelerations of routine working
methods.
2.4.3 Computer Aided Manufacturing (CAM)
describes the data processing support for technical control and supervising
the operating data at the creation of the several objects in production. CAM
covers the automatic making of parts, their automatic transport, and the
automatic stock control.
2.4.4 Computer Aided Planing (CAP)
describes the data processing support at the capacity planning
(Arbeitsplanung?). The capacity planning sets up on the results of CAD or
conventional designing of construction. We have to distinguish betwenn
conventional production and NC production.
2.4.5 Computer Aided Engineering (CAE)
describes the engineered charge of Problems. CAE Systems are formly known
since the beginning of electronic data processing, but today the aim is to lead
to an interactive pre-processing, inclusive to make contact to CAD.
2.4.6 Computer Aided Quality Assurance (CAQ)
Within the CAQ the computer aided functions of quality assurance are
summarized. It is a considerable motto of CIM. It means: „Quality has not
to be proven, but produced!“. The main emphasis of CIM is the quality of
each Product, which leaves the assembly line. This is because refused products
(Ausschußprodukte?) lead to unnecessary expenses and furthermore to
post-working processes, in some cases even to the hole new production of the
part, respectivaly the article, as such. In contrast to conventional quality
control, which only emits refused products, CAQ starts at the very beginning of
the planing of the product. When the checking features and -plans are fixed, it
has influence on the hole construction.
2.5 CIM overview diagramm
3 WHAT IS QUALITY?
Quality has to do with the way we deal with other people, with clear
definitions of work, direction(s) and expectations, and with understanding the
demands that others have on our organisations, our products and our
services.
4 REASON AND CONSEQUENCES OF IMPLEMENTATION
First of all, CIM is, apart from every kind of advantage, a trendy
implementation of todays business. The main reason of implementation is to
reduce drop out rates and to increase quality standards.
The aim of CIM is to put the whole production into a global, firmcoverd
computer network. CIM provides within the CAQ an outstanding quality management.
This is because the CAQ rules over each department.
In CIM, quality control starts at the very beginning of the product
manufacture. From the planing phase over the construction till the assembly
line, quality assurance takes place in the hole production cycle.
As a consequence, the firm gets transparent through every area and the
information flow among each section gets increased.
And last but not least, the customer is satisfied.
|